Bordeaux LRT-TRAM (photo N.2/10 [KB 68] 640 x 426pixels)
   

By Bordeax Metropole (former La Cub)


DESCRIPTION
The original Bordeax tram network opened in 1880 (initial horse tram); electrification took place in 1880. Tram service was finally closed in 1958.
The first phase of the modern Bordeaux Tram opened in 2003-2004, reaching the current asset after the second phase completion (2006-2008) and further extensions (2014, 2015, 2016). The 3 radial lines (Line A, Line B, Line C) serve the main urban areas (Quais de Garonne, Pey-Berland, Pont de Pierre, Quinconces, Gare St-Jean, Cenon, Lormont, Talence, University) and converge on the city center; in the historical zones the tramcars are feeded by a modern third rail system integrated in the tracks, without any overhead wire.
(last modified February 22, 2017 )
HISTORY
datesection nameline
1880initial horse tram opening--
1900electrification completed--
1958tram network closure--
21-12-2003Meriadeck-Buttiniere-Lormont Lauriers/Cenon La MorletteLine A
26-09-2005Meriadeck-Saint AugustinLine A
27-02-2007Cenon La Morlette-Floirac Dravemont;Station Cenon Gare stopLine A
21-06-2007Saint Augustin-Merignac CentreLine A
31-05-2008Lormont Lauriers-La GardetteLine A
24-01-2015Merignac Centre-Le Hallain RostandLine A
15-05-2004Quinconces-Saint-NicolasLine B
03-07-2004Saint Nicolas-BougnardLine B
29-05-2007Bougnard-Pessac CentreLine B
23-07-2007Quinconces-Bassins a FlotLine B
20-10-2008Bassins a Flot-ClaveauLine B
20-06-2014Claveau-Berges de la GaronneLine B
22-06-2015Bougnard-France AlouetteLine B
24-04-2004Gare Saint Jean-QuinconcesLine C
19-11-2007Quinconces-Grand ParcLine C
27-02-2008Grand Parc-Les Aubiers;Gare Saint Jean-Begles Terres NeuvesLine C
01-02-2014Les Aubiers-Berges du LacLine C
24-01-2015Berges du Lac-Parc des ExpositionsLine C
06-03-2015Begles Terres Neuves-Lycee V. HavelLine C
22-06-2015Bougnard-France-AlouetteLine B
17-12-2016Cracovie-Gare de BlanquefortLine C
(last modified February 19, 2017 )
TECHNICAL DATA
Single line length (Km)
Line A:24.2
Line B:19.5
Line C:19.4
Single line stops
Line A:46
Line B:37
Line C:33
Single line avg. distance (km)
Line A:0.55
Line B:0.55
Line C:0.55
Total track length (km)
66.1
Total network stops
116
Avg. stop net distance (km)
0.55
Type
steel wheels
Current/Voltage
750 V DC overhead
Guide/gauge
standard gauge rails (1435 mm)
Vehicles builder
ALSTOM
Model
Citadis 302,Citadis 402
Operator
TRAM ET BUS DE LA CUB (TBC)
Note
APS/Alimentation Par Sol system on part of the track
(last modified February 19, 2017 )
This image is shown smaller (800 x 792 pixels) than its maximum size (1024 x 1014 pixels)
Please click on the map to enlarge it to its maximum size


lrt-tram - bordeaux; By Maximilian Dorrbecker (Chumwa) - Own Work, using OpenStreetMap data for the background, CC BY-SA 2.0, https://commons.wikimedia.org/w/index.php?curid=50868976
report an error

search a city

LATEST UPDATES TO THIS SITE
apm19-02-2017
lrt-tram27-06-2018
metro26-06-2018
funicular20-02-2017
news20-02-2017


LRT-TRAM Bordeaux PHOTO
pictures found on server: 10
click on a picture to enlarge it
Total size of this site MB 268