|  
   
   
   
      
      
      
      
      
         
   
   
   | |  please, hold the mouse on the logo | Vinnytsia  [lrt-tram]Country: Ukraine
 Line: Line 1, Line 2, Line 3, Line 4, Line 5, Line 6
 Inhabitants: City 370000, District --
 
 | 
| DESCRIPTION(last modified February 19, 2017 )Vinnytsia electric tram opened in 1913; its last extension was completed in 2014 (Bars'ke Shose/Zakhidniy Avtovokzal-Vyshen'ka).
 The current network is articulated in 6 lines.
 
 HISTORY(last modified February 19, 2017 )| date | section name | line |  |  |  | 1913 | electric tram opening | -- |  | 19-12-2014 | Bars'ke Shose/Zakhidniy Avtovokzal-Vyshen'ka | -- | 
 
 | (last modified February 19, 2017 )| TECHNICAL DATASingle line length (Km)
 --
 Single line stops
 --
 Single line avg. distance (km)
 --
 Total track length (km)
 21.2
 Total network stops
 40
 Avg. stop net distance (km)
 0.55
 Type
 steel wheels
 Current/Voltage
 600 V DC overhead
 Guide/gauge
 metric gauge rails (1000 mm)
 Vehicles builder
 SWS/SWP7SIG/BBC/ABB,TATRA
 Model
 Be 4/4,Be 4/6,B4,KT4
 Operator
 KP "VINNITSKJE TRAMVAJNO-TROLJEJBUSJE UPRAVLINNJA"
 
 | 
 | 
 This image is shown smaller (800 x 500 pixels) than its maximum size (1200 x 751 pixels)Please click on the map to enlarge it to its maximum size
 lrt-tram - vinnytsia; By Metrotram.it (Source: base map taken from ukrelectro.h11.ru website)
 |  |   
 
 
 
	
	 
 LATEST UPDATES TO THIS SITE| apm | 19-02-2017 |  | lrt-tram | 27-06-2018 |  | metro | 26-06-2018 |  funicular | 20-02-2017 | news | 20-02-2017 | 
 
 
 Total size of this site MB 268 |