|  
   
   
   
      
      
      
      
      
         
   
   
   | |  please, hold the mouse on the logo | Palermo  [lrt-tram]Country: Italy
 Line: Line 1,  Line 2,  Line 3,  Line 4
 Inhabitants: Città 670000, District 1300000
 
 | 
| DESCRIPTION(last modified February 19, 2017 )The original Palermo tram network opened in 1896 (initial horse tram); electrification was completed in 1912. After the second world war tram was finally closed (1947).
 A new tram system opened at the end of 2015; it consists in the following lines: Line 1 (Roccella-Stazione Centrale), Line 2 (Borgo Nuovo-Stazione Notarbartolo), Line 3 (CEP-Stazione Notarbartolo), Line 4 (Corso Calatafimi-Stazione Notarbartolo). Tram interchanges with local railways at Notabartolo and Roccella-Acqua dei Corsari stops; Notarbatolo terminal (tram Lines 2,3,4) and Stazione Centrale Terminal (tram Line 1) are connected by a bus service.
 
 HISTORY(last modified February 19, 2017 )| date | section name | line |  |  |  | 1887 | initial horse tram opening | -- |  | 1912 | electrification completed | -- |  | 1947 | tram network closure | -- |  | 30-12-2015 | Roccella-Stazione Centrale | Line 1 |  | 30-12-2015 | Borgo Nuovo-Stazione Notarbartolo | Line 2 |  | 30-12-2015 | CEP-Stazione Notarbartolo | Line 3 |  | 30-12-2015 | Corso Calatafimi-Stazione Notarbartolo | Line 4 | 
 
 | (last modified February 19, 2017 )| TECHNICAL DATASingle line length (Km)
 --
 Single line stops
 --
 Single line avg. distance (km)
 --
 Total track length (km)
 17.8
 Total network stops
 44
 Avg. stop net distance (km)
 0.4
 Type
 steel wheels
 Current/Voltage
 750 V DC overhead
 Type of guide/gauge
 standard gauge rails (1435 mm)
 Vehicles builder
 BOMBARDIER
 Model
 Flexity Outlook
 Operator
 AMAT
 
 | 
 | 
 This image is shown smaller (800 x 523 pixels) than its maximum size (1920 x 1257 pixels)Please click on the map to enlarge it to its maximum size
 lrt-tram - palermo; By Arbalete - Own work, CC BY-SA 4.0, https://commons.wikimedia.org/w/index.php?curid=46010724
 |  |   
 
 
 
	
	 
 LATEST UPDATES TO THIS SITE| apm | 19-02-2017 |  | lrt-tram | 27-06-2018 |  | metro | 26-06-2018 |  funicular | 20-02-2017 | news | 20-02-2017 | 
 
 
 Total size of this site MB 268 |