|  
   
   
   
      
      
      
      
      
         
   
   
   | |  please, hold the mouse on the logo | Riga  [lrt-tram]Country: Latvia
 Line: Line 2, Line 3, Line 4, Line 5, Line 6, Line 7, Line 9, Line 10, Line 11
 Inhabitants: City 640000, District 1020000
 
 | 
| DESCRIPTION(last modified February 19, 2017 )Riga tram opened in 1882 (initial horse tram) and it was electrified in 1901. Its last extension was completed in 1984 (Baldones iela/Kuldigas iela-Imanta).
 The current network is articulated in 7 lines.
 
 HISTORY(last modified February 19, 2017 )| date | section name | line |  |  |  | 1882 | initial horse tram opening | -- |  | 1901 | electrification completed | -- |  | 1984 | Baldones iela/Kuldigas iela-Imanta | -- | 
 
 | (last modified February 19, 2017 )| TECHNICAL DATASingle line length (Km)
 --
 Single line stops
 --
 Single line avg. distance (km)
 --
 Total track length (km)
 54.7
 Total network stops
 --
 Avg. stop net distance (km)
 --
 Type
 steel wheels
 Current/Voltage
 600 V DC overhead
 Guide/gauge
 1524 mm gauge rails
 Vehicles builder
 TATRA,SKODA
 Model
 T3A,T3MR,15T
 Operator
 RIGA SATIKSME
 
 | 
 | 
 This image is shown smaller (800 x 563 pixels) than its maximum size (1000 x 704 pixels)Please click on the map to enlarge it to its maximum size
 lrt-tram - riga; By Metrotram.it (source: saraksti.rigassatiksme.lv official website)
 |  |   
 
 
 
	
	 
 LATEST UPDATES TO THIS SITE| apm | 19-02-2017 |  | lrt-tram | 27-06-2018 |  | metro | 26-06-2018 |  funicular | 20-02-2017 | news | 20-02-2017 | 
 
 
 Total size of this site MB 268 |