| |   Official Logo
 | Krakow  [lrt-tram]Country: Poland
 Line: Tram:Line 1, Line 2, Line 3, Line 4, Line 5, Line 6, Line 7, Line 8, Line 9, Line 10, Line 11, Line 12, Line 13, Line 14, Line 15, Line 16, Line 18, Line 19, Line 20, Line 21, Line 22, Line 23, Line 24, Line 52, Line 62, Line 64, Line 69
 Fast Tram:Line 50
 Inhabitants: City 760000, District 1720000
 
 | 
 DESCRIPTION(last modified February 19, 2017 )Krakow tram opened in 1882; it was electrified in 1901. The last tram network extensions were completed in 2008 (Politechnika-Rondo Mogilskie tunnel), 2011 (Kobierzynska-Ruzcaj), 2012 (Ruzcaj-Czerwone Maki) and 2015 (Dworcowa-Dw. Plaszow-Lipska).
 Krakow Fast Tram line (Line 50) opened on 11 December 2008; this line includes a tunnel section passing underneath Dworzec Glowny railway station. This modern LRT/tram line connects Kurdwanow (south) with Krowodrza Gorka (north), passing through the city centre. Fast Tram line runs partly over the existing tram tracks and partly over new infrastructures. The urban segment of this line starts at Rondo Grzegorzeckie (east of the city centre), then it passes the Bothanical Garden and reaches Rondo Mogilskie, where it get under Dworzec Glowny railway station (through Politechnika-Rondo Mogilskie tunnel); then it turns north proceeding ground level through the Politecnique area, and joins the existing tram tracks at Dworzek Towarowy, prosecuting up to Krowodrza Gorka.
 The current tram network includes 27 ordinary tram lines and 1 Fast Tram line.
 
 | HISTORY(last modified February 19, 2017 )| date | section name | line |  |  |  | 1882 | original horse tram alignment | -- |  | 1901 | electrification completed | -- |  | 11-12-2008 | Politechnika-Rondo Mogilskie tunnel | -- |  | 30-12-2011 | Kobierzynska-Ruzcaj | -- |  | 17-11-2012 | Ruzcaj-Czerwone Maki | -- |  | 31-08-2015 | Dworcowa-Dw. Plaszow-Lipska | -- | 
 
 | (last modified February 19, 2017 )| TECHNICAL DATASingle line length (Km)
 --
 Single line stops
 --
 Single line avg. distance (km)
 --
 Total track length (km)
 97
 Total network stops
 78
 Avg. stop net distance (km)
 1.25
 Type
 steel wheels
 Current/Voltage
 600 V DC overhead
 Guide/gauge
 standard gauge rails (1435 mm)
 Vehicles builder
 KONSTAL,BOMBARDIER,DUEWAG,MAN,PROTRAM,BOMBARDIER,PESA
 Model
 105Na,NGT6,NGT8,GT8S,E1,N8S-NF,EU8N,405N-Kr,126N,Flexity Classic (NGT6),2014N "Krakowiak"
 Operator
 MPK KRAKOW
 
 | 
 | 
 This image is shown smaller (800 x 457 pixels) than its maximum size (1920 x 1098 pixels)Please click on the map to enlarge it to its maximum size
 lrt-tram - krakow; By Zyxist (Own work) [Public domain], via Wikimedia Commons
 |