| |  please, hold the mouse on the logo | Mulhouse  [lrt-tram]Country: France
 Line: Tram 1, Tram 2, Tram 3, Tram-train [track-sharing]
 Inhabitants: City 110000,  District 280000
 
 | 
 DESCRIPTION(last modified February 19, 2017 )Mulhouse first tram opened in 1882 (initial horse tram) and it was electrified in 1894. The original tram network was closed in 1957.
 Two modern LRT/tram lines (Tram 1, Tram 2) opened in 2006.
 Tram 1 initially ran from Gare Centrale (south) to Rattachement (north); it was extended from Rattachement to Chataignier in 2009. This north-south line serves the stadium, the exhibition area and the railway station (Gare Centrale).
 Tram 2 runs from Coteaux (south-west) to Nouveau Bassin (east), serving the sports arena and the university; Tram 1 and Tram 2 interchange in the city centre (Porte Jeune).
 A third line (Tram 3) opened on December 2010, running north-west from Gare Centrale to Lutterbach; it shares part of its track with Tram 1 (Gare Centrale-Porte Jeune Europe) and Tram 2 (Porte Jeune-Rond Point Stricker, located between Palasport and Daguerre stops); from Rond-Point Stricker to Lutterbach Tram 3 runs over an existing railway alignement (this railway segment is electrified at 750 V DC, so Tram 3 is a purely tram service).
 A fourth line (Tram-Train) opened as well on December 2010, connecting Thann with Gare Centrale; Tram-Train line shares part of its track both with SFNC trains (Thann-Lutterbach; this railway segment is electrified at 25 kV AC) and both with tram-cars (Lutterbach-Gare Centrale section, electrified at 750 V DC). This kind of track-sharing operations are possible due to the adoption of a dual voltage rolling stock (running over the train section at 25 kV AC , running over tram tracks at 750 V DC).
 
 | HISTORY(last modified February 19, 2017 )| date | section name | line |  |  |  | 1882 | initial steam tram opening | -- |  | 1894 | electrification completed | -- |  | 1957 | original tram network closure | -- |  | 13-05-2006 | Gare Centrale-Rattachement | Line 1 |  | 04-07-2009 | Rattachement-Chataignier | Line 1 |  | 13-05-2006 | Coteaux-Nouveau Bassin | Line 2 |  | 12-12-2010 | Gare Centrale-Lutterbach | Line 3 |  | 12-12-2010 | Gare Centrale-Thann | Tram-Train | 
 
 | (last modified February 19, 2017 )| TECHNICAL DATASingle line length (Km)
 Tram 1:5.8
 Tram 2:6.2
 Tram 3:7
 Tram-train:22
 Single line stops
 Tram 1:12
 Tram 2:14
 Tram 3:11
 Tram-train:18
 Single line avg. distance (km)
 Tram 1:0.55
 Tram 2:0.5
 Tram 3:0.7
 Tram-train:1.3
 Total track length (km)
 16.2
 Total network stops
 19
 Avg. stop net distance (km)
 0.9
 Type
 steel wheels
 Current/Voltage
 Tram 1,Tram 2,Tram 3:750 V DC overhead
 Tram-train:750 V DC/25 kV AC overhead
 Type of guide/gauge
 standard gauge rails (1435 mm)
 Vehicles builder
 Tram 1,Tram 2:ALSTOM
 Tram 3:ALSTOM,SIEMENS
 Tram 4:SIEMENS
 Model
 Tram 1,Tram 2:Citadis 302
 Tram 3:Citadis 302,Avanto U25500
 Tram 4:Avanto U25500
 Operator
 SOLEA
 
 | 
 | 
 This image is shown smaller (800 x 584 pixels) than its maximum size (1600 x 1168 pixels)Please click on the map to enlarge it to its maximum size
 lrt-tram - mulhouse; By Nuy (Own work using Openstreetmap) [CC0], via Wikimedia Commons
 |