Information portal about all European guided public transportation systems. This site is regularly updated.
Konya LRT-TRAM (photo N.4/5 [KB 134] 800 x 600pixels)
   

By Ex13 (Own work) [CC BY-SA 3.0 (http://creativecommons.org/licenses/by-sa/3.0)], via Wikimedia Commons


DESCRIPTION
Konya tram opened in 1992 running from Alaaddin (south) to S. Univerversitesi Fakulteler (north). A southern extension was completed on September 2015 (Alaaddin-Adlyie).
The current tram service is organized in 2 routes (Line 1, Line 2).
(last modified February 19, 2017 )
HISTORY
datesection nameline
1992Alaaddin-Fen Edebyat FakultelesiLine 1
29-09-2015Alaaddin-AdlyieLine 2
(last modified February 19, 2017 )
TECHNICAL DATA
Single line length (Km)
--
Single line stops
--
Single line avg. distance (km)
--
Total track length (km)
22.4
Total network stops
40
Avg. stop net distance (km)
0.60
Type
steel wheels
Current/Voltage
750 V DC overhead
Guide/gauge
standard gauge rails (1435 mm)
Vehicles builder
SKODA
Model
28T
Operator
--
(last modified February 19, 2017 )
this map is shown here at its maximum resolution (399 x 798)


report an error

search a city

LATEST UPDATES TO THIS SITE
apm19-02-2017
lrt-tram27-06-2018
metro26-06-2018
funicular20-02-2017
news20-02-2017


LRT-TRAM Konya PHOTO
pictures found on server: 5
click on a picture to enlarge it
Total size of this site MB 268