MetroTram Information portal about guided public transportation in Europe since 1980.
The site now contains technical cards of 282 european systems. This site will be periodically updated.
apm   cable   lrt   metro   monorail   tramway   tram on tyres   tram-train  
nations   cities   producers   km   stations   summary   europe   trend   next  
news   author   papers   logos   disclaimer   contacts   links   biblio  

= Official pictures included
= Updated less than 4 weeks ago
Before 1980
ROLLING STOCK
ALICANTE-4L
ALICANTE-L3
ALICANTE-L4
ANGERS
ATHENS
BERGEN
BERN
BESANCON
BILBAO-A
BILBAO-UPV
BIRKENHEAD
BLACKPOOL
BORDEAUX
BOTOSANI
BREST
CLUJ-NAPOCA
CONSTANTA
CRAIOVA
DIJON-A
DIJON-B
DUBLIN
EDINBURGH
FLORENCE-L1
FLORENCE-L2
FLORENCE-L3
GENEVE
GRENOBLE
ILEDEFRANCE
ISTANBUL-T1
ISTANBUL-T2
JAEN
KOHLFURTH
LA-CORUNA
LE-HAVRE
LE-MANS
LONDON
LYON-T1
LYON-T2
LYON-T4
MALMO
MARSEILLE-T1
MARSEILLE-T2
MASYR
MESSINA
MOLOCHNE
MONTPELLIER-L1
MONTPELLIER-L2
MONTPELLIER-L3
MULHOUSE-L1
MULHOUSE-L2
MULHOUSE-L3
MURCIA
NANTES-L1
NANTES-L2
NANTES-L3
NEAPLES
NICE
OBERHAUSEN
ORLEANS-A
ORLEANS-B
PALERMO
PARIS-T1
PARIS-T2
PARIS-T3
PARIS-T7
PARIS-T8
PARLA
PLOIESTI
POTSDAM
REIMS
RESITA
SAINT-ETIENNE
SCHONBERGER-STRAND
SEVILLA-T1
SEVILLA-TA
STARY-OSKOL
STOCKHOLM-L7
STRASBOURG
TENERIFE-L1
TENERIFE-L2
TOULON
TOULOUSE-T1
TOURS
TURIN-L4
TURIN-L9
VALENCIA-T2
VALENCIA-T4
VALENCIA-T5
VALENCIA-T6
VALENCIENNES
VELEZMALAGA
ZARAGOZA
ZURICH
leggi in Italiano A A
search this site ?
(Spain )SEVILLA-TA

Seville
In Seville the first section (Ciudad Expo-Condequinto) of a new LRT (Line 1, about half of the track underground) opened on 02 April 2009. This project partly recovers an original plan (years '70s) of a 3 lines heavy metro network, whose construction was suspended at the beginning of years '80s because of the risk to damage some historical buildings. So a new network project has been developed; it's based on 4 LRT lines (Line 1 is the first to be realized) and some connecting modern tram lines, instead of the original heavy metro plan. Line 1 (completed on November 2009 with Condequinto-Olivar de Quinto section) runs from Mairena del Aljarafe (interchange stop) to Montequinto, with 22 stops serving the Expo area (Ciuidad Expo, in Mairena del Aljarafe), the university, the city center and some railway stations (San Bernardo, Guadaira).
On 28 October 2007 the so-called MetroCentro has been opened (Prado-Plaza Nueva section); the concept of this tram line is to connect the future LRT lines 1 and 2. The first stretch will be extended at both terminals (towards Santa Justa and Puerta Osario).
Besides Line 1 and MetroCentro, the whole network will be improved by other 3 LRT lines. Line 2 will run east-west, with a central underground section; in a further phase it could be extended towards the airport (east) and Aljarafe (west). In order to have at least an interchange point with Line 1, a short underground section could be realized connecting S. Justa (L2) and Nervion (L1) stops. Line 3 will run north-south, with a central underground section and interchange points with all the other LRT lines; a possible southern extension (Los Bermejales-Bellavista) is considered. Line 4 will have a crucial role for the network efficiency, thanks to its circular shape; it should be mostly ground level totally segregated from road traffic.
In middle term, it's expected a circular tram line (Tranvia de Aljarafe) connecting some municipalities of the Aljarafe region to Sevilla. At least 3 interchanges stops (tranvia/light metro) must be mentioned: Ciudad Expo, Cavaleri, San Juan Alto. This 28 km long line will be realized in 4 phases (ph.1: Coria del Rio-Mairena del Aljarafe; ph.2: Mairena-Burmujos; ph.3:Bormujos-San Juan de Aznalfarache; ph. 4: Bormujos-Valencina), serving many important polarities (Bormujos Hospital, Universidad San Pablo-CEU, poligono PISA,etc.).
Metro Sevilla (official site)
Sevilla21.com

description uptaded on Jan 29th, 2011

map created on Feb 2nd, 2011 (© 2005-2014 Ing. M. Tarozzi)

CountrySpain
LineTA (Tranvia de Aljarafe)
InhabitantsCity 710.000
District 1.100.000
Date opening2013
Future development:--
Length (km)28
Track sections--
Stops--
Platformscentral
Platform doors--
General characteristicslength 65 m, width 11 m, height 30 cm
n. of vehicles--
n. of cars per vehicle--
Typesteel wheels
Vehicle dimensions (m)--
Vehicle capacity (pax)--
Frequency --
Current/Voltage--
Type of guide/gaugestandard gauge rails (1435 mm)
Speed Km/h--
Accel./Decel. (m/sec2)--
System capacity--
Ridership6 millions pax/year
Total cost10 M Euro/km
Staff--
System builder--
Model--
NOTEph.1: Coria del Rio-Mairena del Aljarafe; ph.2: Mairena-Burmujos; ph.3:Bormujos-San Juan de Aznalfarache; ph.4: Bormujos-Valencina
technical data uptaded on Jan 29th, 2011