Neaples
Neaples metro network consists in 3 lines; 2 of them are properly said metro lines (Line 1 and Line 6), while other 2 consists in urban branches of suburban railways (Line 2, Line 3).
Line 1 (named also as Metropolitana Collinare) runs from Piscinola to Dante; the first section Colli Aminei-Vanvitelli opened in 1993 and was extented in 1995 up to Piscinola, while in 2001-2002 the further a extension to Museo and Dante was completed. Vanvitelli-Salvator Rosa section runs in a curved gallery, with a 5.5% average gradient. Two more sections are currently under construction (Dante-Garibaldi railway station, Piscinola-Capodichino Airport), while in long term plans Line 1 track will be close into a 25 km long ring (thanks to the future Capodichino-Garibaldi section).
Line 6 connects the agglomerations of Fuorigrotta and Mergellina; its first section (Museo-Mergellina) opened in 2007. This line was built partly re-using some of the infrastructures of the so-called Linea Tranviaria Rapida, a LRT Line which had to be opened in occasion of Italia 90 Championhip but never completed. A western extension (Mergellina-Municipio) is under construction, while an eastern one is in advanced planning phase (Museo-Arsenale Militare depot).
www.metro.na.it (official site)
description uptaded on Jan 29th, 2011
map created on Jan 29th, 2011 (© 2005-2013 Ing. M. Tarozzi)
| CHRONOLOGY |
| 04-02-2007 | Musei-Mergellina
|
| Country | Italy
|
| Line | Line 6
|
| Inhabitants | City 1.000.000, District 3.000.000
|
| Date opening | 2007
|
| Future development: | under construction: Mergellina-Municipio; planned: Musei-Arsenale Militare depot
|
| Length (km) | 2.3
|
| Track sections | totally underground
|
| Stops | 4 average distance m 800
|
| Platforms | --
|
| Platform doors | --
|
| general characteristics | --
|
| n. of vehicles | --
|
| n. of cars per vehicle | --
|
| Type | steel wheels
|
| Vehicle dimensions (m) | length --, width --
|
| Vehicle capacity (pax) | 570
|
| Frequency | 6/ min
|
| Current/Voltage | 750 V DC overhead
|
| Guide/gauge | standard gauge rails (1435 mm)
|
| Speed Km/h | --
|
| Accel./Decel. (m/sec2) | --
|
| System capacity | 7600 pphpd
|
| Ridership | --
|
| Total cost | --
|
| Staff | --
|
| System builder | ANSALDO
|
| Model | T67
|
| NOTE | total length (awith Mergellina-Municipio extension) ~ 5.5 km
|