MetroTram Information portal about guided public transportation in Europe since 1980.
The site now contains technical cards of 282 european systems. This site will be periodically updated.
apm   cable   lrt   metro   monorail   tramway   tram on tyres   tram-train  
nations   cities   producers   km   stations   summary   europe   trend   next  
news   author   papers   logos   disclaimer   contacts   links   biblio  

= Official pictures included
= Updated less than 4 weeks ago
Before 1980
ROLLING STOCK
ATHENS-L2
ATHENS-L3
ATHENS-L4
BARCELONA-L2
BRUSSELS-L2
BUCHAREST-M2
BUCHAREST-M3
BUCHAREST-M4
CATANIA
DNIPROPETROVSK
GENOA
HAMBURG-U4
ISTANBUL-M2
IZMIR
KAZAN
KHARKIV-ALEKSEJEV
KHARKIV-SALTOV
KIEV-L3
KIEV-L4
LISBON-VERMELHA
MADRID-L11
MADRID-L12
MADRID-L8
MADRID-L9
MARSEILLE-M2
MILAN-M3
MINSK-L1
MINSK-L2
MOSCOW-L10
MOSCOW-L11
MOSCOW-L9
MUNICH-U1
MUNICH-U2
MUNICH-U4
MUNICH-U5
NAPOLI-L1
NAPOLI-L6
NIZHNIY-NOVGOROD
PALMA
PRAGUE-B
ROME-A
SAMARA
SOFIA
ST-PETERSBURG-L4
ST-PETERSBURG-L5
VALENCIA-L1
VALENCIA-L3
VALENCIA-L5
VIENNA-U2
VIENNA-U3
VIENNA-U6
VILNIUS
WARSAW
leggi in Italiano A A
search this site ?
(Turkey )ISTANBUL-M2

Images kindly supplied by Istanbul Ulasim Company. (Thanks)

Levent stop

platform (1)

platform (2)

platform (3)

corridor

control line
Istanbul
The first tramway line was opened in Istanbul in 1869; this horse tram electrified in 1914. Like in other towns tram was dismantled after the second world war (in 1961 in the european part of Istanbul, in 1966 in the asiatic one) in favour of a bus network.
Parts of the old tram have been recently re-opened: in 1990 in the european zone (1.6 km from Taksim and Tunel), in 2003 in the asiatic zone.
Contermporaneous to the old tram is the so-called Tunel (above mentioned) an underground cable system (570 m long) opened in 1875 and still working (it was the second metro system in the world, after London); another modern underground cable system (600 m long) was opened in 2006 from Kabata Hizli Tramway stop to Taksim metro stop.
In 1989 an LRT line started its service from Aksaray to Kartaltepe (M1); the so-called Hafif Metro system is totally segregated from road traffic and it has been constantly extended up to Ataturk Airport (2002). A second Hafif Metro line (T4, from Edirnekapi to Mescid-i Selam) opened in 2007 followed by its southern extension towards Topkapi on March 2009. So that the whole Hafif Metro system reached the current lenght of 34 km with a remarkable growth of the ridership.
A modern tram line (Hizli Tramway or T1) is in service since 1992; the first stretch from Sirkeci to Topkapi has been extended in 1993 (Topkapi-Zeytinburnu), 1996 (Sirkeci-Eminonu) and 2005 (Sirkeci-Kabatas). Hizli Tramway is currently 14 km long, with 24 stops. A second tram line (T2) from Zeytinburnu to Bagcilar (about 5 km long) opened in 2006.
A traditional metro line (M2) opened in 2000 from Taksim to 4th Levent (8.5 km, 6 stops). 4 Levent - Ataturk Oto Sanayi (5.5 km, 3 stops) and Taksim - Sishane (1.6 km, 1 stop) extensions opened on 30 January 2009, followed by Sanayi-Seyrantepe section (1 km) on 11 November 2010; another extension (Darussafaka-Haciosman) opened on 23 May 2011. The current ridership is 130.000 pax/day.
A modern bus system in reserved lanes placed in the middle of E5 motorway opened in 2007, for the direct connection of Ataturk International Airport to the city center (Topkapi); some innovative APTS Phileas tram-on-tyres have been introduced since the beginning of 2008. APTS vehicles suffered many technical problems caused by the high ridership and the morphology of the track.
Suburban railways also have an important role; the line from Sirkeci railway station to Alkali (in european territory) will be in the next future connected to the Haydarpasa-Gebze line (in asiatic territory), thanks to the so-called Marmaray, an undersea rail tunnel across the Bosphorus Strait. Metro and Hafif Metro extensions up to Yenikapi (where suburban railway stops) are going to increase the interchange potentialities of the whole transport system.
Istanbul-Ulasim (official site)

description uptaded on Sep 5th, 2011

map created on Sep 5th, 2011 (© 2005-2014 Ing. M. Tarozzi)

CHRONOLOGY
16-09-2000Taksim-4 Levent
30-01-20094 Levent-Ataturk Oto Sanayi
30-01-2009Taksim-Sishane
02-09-2010Ataturk Oto Sanayi-Darussafaka
11-11-2010Sanayi-Seyrantepe
23-05-2011Darussafaka-Haciosman

CountryTurkey
LineM2
InhabitantsCity 2.800.000, District 7.900.000
Date opening2000
Future development:southern extension (Sishane-Yenikapi)
Length (km)20
Track sectionstotally underground
Stops13, average distance 1500 m
Platforms--
Platform doorsno
general characteristicslength 180 m
n. of vehicles16 (ALSTOM: 8; EUROTEM: 8)
n. of cars per vehicle4
Typesteel wheels
Vehicle dimensions (m)--
Vehicle capacity (pax)--
Frequency3.5'/15'
Current/Voltage 750 V DC from third rail
Guide/gauge standard gauge rails (1435 mm)
Speed Km/hComm 42, Max 80
Accel./Decel. (m/sec2)--
System capacity90.000 pphpd
Ridership130.000 pax/day
Total cost--
Staff--
System builderALSTOM, EUROTEM HUNDAY ROTEM
Model--
NOTEorder for further 15 Eurotem vehicles
technical data uptaded on Sep 5th, 2011