(Spain

)
GRANADA
Granada
Works are going on in Granada for the construction of a LRT line connecting Albolote, Maracena, Estadio de la Juventud, Río Genil, Campus de la Salud and Armilla districts; the track presents an underground central section (Camino de Ronda, about 2.5 km) and runs from the northern to the southern side of the town (the latter hosts the main residential agglomeration), serving some of the most important urban polarities (railway station, bus terminal, university, Campus de la Salud). Opening cerimony is expected in 2011.
Metropolitano de Granada (official site)
description uptaded on Feb 1st, 2011
map created on Feb 1st, 2011 (© 2005-2013 Ing. M. Tarozzi)
| Country | Spain
|
| Line | Metropolitano de Granada
|
| Inhabitants | City 240.000, District 500.000
|
| Date opening | 2011
|
| Future development | --
|
| Length (km) | 15.9
|
| Track sections | ground level with an underground central section (2.5 km, 3 stops)
|
| Stops | 26 average distance 650 m
|
| Platforms | lateral and central
|
| Platform doors | --
|
| General characteristics | length 68 m, width 2.5/3 m
|
| n. of vehicles | 15
|
| n. of cars per vehicle | 5
|
| Type | steel wheels
|
| Vehicle dimensions (m) | length --, width --
|
| Vehicle capacity (pax) | 200 (50 seated)
|
| Frequency | --
|
| Current/Voltage | 750 V DC overhead
|
| Guide/gauge | standard gauge rails (1435 mm)
|
| Speed Km/h | Comm 20 (ground level)-28 (underground), Max 50 (ground level)-70 (underground)
|
| Accel./Decel. (m/sec2) | --
|
| System capacity | --
|
| Ridership | 13 millions pax/year
|
| Total cost | 25 M Euro/km
|
| Staff | --
|
| System builder | CAF
|
| Model | Urbos 3
|
| NOTE | -- |
technical data uptaded on Feb 1st, 2011