(Denmark

)
COPENAGHEN-M1-M2
| Images kindly supplied by Metro Service. (Thanks) |
 Fredriksberg stop |  viaduct section |  platform doors |
 Orestad stop |  depot |  Kongens Nytorv stop |
|
Copenaghen
Copenaghen from 2002 has a new automated metro system, based on two radial lines (M1: Vanlose-Vestamager; M2: Vanlose-Lufthavnen/Airport, both partly in viaduct and partly at ground level) converging in the city centrum at Christianshavn stop; then, the 2 lines merge into a central section in bored deep tunnel (Christianshavn-Vanlose).
The metro network assure two important interchanghe point with existing railway net (Orestad stop for national trains, Norreport for regional trains); the airport link (Lergravsparken-Airport section) opened on 28 September 2007.
A further line (City Circle Line), whose track will be used by M3 on the entire line and M4 only in the eastern side, should open in 2018; it will serve Norrebro, Kobenhavn H (central station) and Frederiksberg areas, interchanging with M1 and M2 at Kongens Nytorv and Frederiksberg.
www.m.dk (sito ufficiale)
description uptaded on Jan 29th, 2011
map created on Jan 29th, 2011 (© 2005-2013 Ing. M. Tarozzi)
| CHRONOLOGY |
| 19-10-2002 | Norreport-Vestamager; Norreport-Lergravsparken
|
| 29-05-2003 | Norreport-Frederiksberg
|
| 12-10-2003 | Frederiksberg-Vanlose
|
| 24-01-2004 | Flintholm stop
|
| 28-09-2007 | Lergravsparken-Lufthavnen |
| Country | Denmark
|
| Line | M1,M2
|
| Inhabitants | City 650.000, District 1.300.000
|
| Date opening: | 2002
|
| Future development: | --
|
| Length (km) | 21.4
|
| Track sections (km): | underground km 9, cut and cover km 2,4, viaduct km 10
|
| Stops | n. 22 underground 9, viaduct 13, Average distance (m) 971
|
| Platform type | central
|
| Platform doors | yes
|
| General characteristics | dimensions (m) length 61, width 20
|
| n. of vehicles | 34
|
| n. of cars per vehicle | 3
|
| Type | steel wheels
|
| Vehicle dimensions (m) | length 39, width 2,65
|
| Vehicle capacity | 300
|
| Frequency (max/min) | 2'/15'
|
| Current/Voltage | third rail
|
| Guide/gauge | rotaie
|
| Speed (km/h) | commercial 40, max 80
|
| Accel./Decel. (m/sec2) | --
|
| System capacity | 12000 pphpd
|
| Ridership | --
|
| Total cost | 70 M Euro/km
|
| Staff n. | 200
|
| System builder | ANSALDO
|
| NOTE | double bored tunnel (single diameter: int 4,9 m, ext 5,5 m)
|
technical data uptaded on Jan 29th, 2011