(Italy

)
CAGLIARI
Cagliari
The first line of a new LRT system opened in Cagliari on 17 March 2008; Line 1 connects Cagliari (P.zza Repubblica) to the neighboring agglometration of Monserrato (S. Gottardo). The whole network (once completed 8 new lines) will consist in 2 urban rings and 4 suburban branches (towards Sestu, Elmas Airport, Settimo S. Pietro/Senorbì, Quartu), also thanks to the renewal (electrification) of local metric gauge existing railways due to a new suburban usage.
In the urban areas the signalling system is simply based on traffic lights.
FdS metropolitana Cagliari (official site)
description uptaded on Jan 29th, 2011
map created on Jan 29th, 2011 (© 2005-2013 Ing. M. Tarozzi)
| CHRONOLOGY |
| 17-03-2008 | Cagliari (P.zza Repubblica)-Monserrato (S. Gottardo)
|
| Country | Italy
|
| Line | --
|
| Inhabitants | City 163.000
|
| Date opening | 2008
|
| Future development: | extension to Cittadella Universitaria
|
| Length (km) | 6.45 km
|
| Track sections | 6.27 km in segregated lanes on an elder railway track
|
| Stops | 9, average distance m 806
|
| Platforms | --
|
| Platform doors | --
|
| General characteristics | height cm 25
|
| n. of vehicles | 6
|
| n. of cars per vehicle | 5
|
| Type | steel wheels bi-directional
|
| Vehicle dimensions (m) | length 29.19, width 2.46
|
| Vehicle capacity (pax) | 200 (44 seated)
|
| Frequency | 7/17 min
|
| Current/Voltage | 750 V DC overhead
|
| Type of guide/gauge | 950 mm gauge rails
|
| Speed Km/h | Comm 25.6, Max 70
|
| Accel./Decel. (m/sec2) | --
|
| System capacity | 1630 pphpd
|
| Ridership | --
|
| Total cost | 36,3 M Euro
|
| Staff | --
|
| System builder | SKODA
|
| Model | 06T modified
|
| NOTE | --
|
technical data uptaded on Jan 29th, 2011