MetroTram Information portal about guided public transportation in Europe since 1980.
The site now contains technical cards of 282 european systems. This site will be periodically updated.
apm   cable   lrt   metro   monorail   tramway   tram on tyres   tram-train  
nations   cities   producers   km   stations   summary   europe   trend   next  
news   author   papers   logos   disclaimer   contacts   links   biblio  

= Official pictures included
= Updated less than 4 weeks ago
Before 1980
ROLLING STOCK
AMSTERDAM-L26
AMSTERDAM-L50
AMSTERDAM-L51
AMSTERDAM-L52
ANKARA
BARCELONA-BAIX
BARCELONA-BESOS
BELGRADE
BERGAMO
BERGEN
BILBAO-L1
BILBAO-L2
BIRMINGHAM
BOCHUM
BOLOGNA
BURSA
CAGLIARI
CHARLEROI
CROYDON
DEBA
GRANADA
HELSINKI
ISTANBUL-M1
ISTANBUL-T4
KRAKOV
KRYVY-RIH
LAUSANNE-M1
LIONE-RHONEXPRESS
LISBON-MTS
LYON-T3
MADRID-ML2
MADRID-ML3
MADRID_ML1
MALAGA
MILAN-CINISELLO
MILAN-INTER-NORD
MILAN-NORTH
MILAN-SOUTH
MOSCOW-BLLM
NEWCASTLE
NOTTINGHAM
OPORTO
PARMA
POZNAN
ROUEN
SASSARI
SEVILLA-L1
SEVILLA-L2
SEVILLA-L3
SEVILLA-L4
SHEFFIELD
STOCKHOLM-L22
TURIN-L3
UTRECHT
VITORIA-GASTEIZ
VOLGOGRAD
leggi in Italiano A A
search this site ?
(Turkey )BURSA

Images kindly supplied by Burulas. (Thanks)

Esentepe stop

Fatih Sultan Memhet stop

Hamitler stop

Ihsaniye stop

Karaman stop

Kucuk Sanayi stop

Kulturpark stop

Merinos stop

Nilufer stop
Bursa
A modern LRT system operates in Bursa (Turkey) since 2002; it's about 30 km long, articulated in 2 lines (Line 1: Organize Sanayi-Araba Yatagi; Line 2: Araba Yatagi-Ozluce) which mostly run ground level totally segregated from road traffic, with short underground sections. Sehrekustu-Araba Yatagi extension eastern extension opened on April 2008, followed by Kucuk Sanayi-Ozluce section on December 2010.
The line reached the university (Ozluce-Uludag Universitesi section) on September 2011, while a further northern extension (Organize Sanayi-Emek) opened on December 2011.
Bursaray.com (official site)

description uptaded on Dec 30th, 2011

map created on Oct 11th, 2011 (© 2005-2014 Ing. M. Tarozzi)

CHRONOLOGY
19-08-2002Sehrekustu-Kucuk Sanayi,Sehrekustu-Organize Sanayi
06-04-2008Sehrekustu-Araba Yatagi
24-12-2010Kucuk Sanayi-Ozluce
19-09-2011Ozluce-Uludag Universitesi
15-12-2011Organize Sanayi-Emek

CountryTurkey
LineBursaray
InhabitantsCity 2.000.000, District 2.500.000
Date opening2002
Future development:eastern extension (Arabayatagi-Kestel)
Length (km)31
Track sectionstotally segregated from road traffic
Stops25 average distance 1250 m
Platforms--
Platform doors--
general characteristicslength 120 m, width --
n. of vehicles48
n. of cars per vehicle1-2-3-4
Typesteel wheels
Vehicle dimensions (m)length 27.7, width 2.65
Vehicle capacity (pax)287 (60 seated)
Frequency--
Current/Voltage 1500 V DC overhead
Guide/gauge standard gauge rails (1435 mm)
Speed Km/hComm 34, Max 70
Accel./Decel. (m/sec2)1.2/1.3
System capacity25.000 pphpd
Ridership155.000 pax/day
Total cost16 M Euro/km
Staff--
System builderSIEMENS
ModelB80
NOTE--
technical data uptaded on Dec 30th, 2011