(Greece

)
ATHENS
| Images kindly supplied by TRAM S.A.. (Thanks) |
 track on grass |  Irinis&Filias Stadium |  reserved lane |
 depot |  tram stop |  tramcar washing |
|
Athens
Athens new tramway has been launched in 2004 before the Olympic Games, in order to integrate the metro system with a ground level service. Metro and tram interchange at Syntagma (metro lines 2 and 3), Neos Kosmo and Fix (metro line 2).
At the end of XIX century the Greek capital developed an horse tramway net (1882), which was soon electrified (1887). In the first decades of XX century this nework had a great expansion, but after the second world war it was constantly reduced (years '50s and '60s) before being totally closed (1977).
The new system consists in a section from the city center (Syntagma) to Mousson (passing through Nea Smyrni and Paleo Faliro), where the track branches in north-western (Faliriko Delta, Neo Faliro, Peace & Friendship Stadium) and south-eastern (Alimos, Helliniko, Glyfada and, since November 2007, Voulas) segments.
Tramway is also connected to suburban railways (line 1) at Peace & Friendship Stadium.
Athens Tram (official site)
description uptaded on Jan 29th, 2011
map created on Jan 29th, 2011 (© 2005-2013 Ing. M. Tarozzi)
| CHRONOLOGY |
| 19-07-2004 | Stadio Irinis&Filias/Syntagma-Glyfadas
|
| November 2007 | Glyfadas-Voulas |
| Country | Greece
|
| Line | --
|
| Inhabitants | City 900.000, District 3.100.000
|
| Date opening | 2004
|
| Previsione di completamento della rete: | north-western extension to Piraeus
|
| Length (km) | 25.9
|
| Track sections | ground level (95% in reserved lanes)
|
| Stops | 47, average distance m 465
|
| Platforms | --
|
| Platform doors | --
|
| general characteristics | height cm 27.5
|
| n. of vehicles | 35
|
| n. of cars per vehicle | 5
|
| Type | steel wheels bi-directional
|
| Vehicle dimensions (m) | Length 31.9; width 2.4
|
| Vehicle capacity (pax) | 205 (56 seated)
|
| Frequency | 7.5'/10'
|
| Current/Voltage | 750 V DC overhead
|
| Guide/gauge | standard gauge rails (1435 mm)
|
| Speed Km/h | Comm. 21, Max 70
|
| Accel./Decel. (m/sec2) | 1.2/1.2
|
| System capacity | 2.500 pphpd
|
| Ridership | 65000 pax/day
|
| Total cost | 14 M Euro/km
|
| Staff | 550
|
| System builder | ANSALDO
|
| Model | Sirio
|
| NOTE | maximum gradient: 6.5%; minimum horizontal radius: 23 m |
technical data uptaded on Feb 11th, 2011