(France

)
ANGERS
Angers
The first line of a modern tramway network is under construction in Angers.Line A (12 km) opened on 25 June 2011 running from Avrille to Angers southern side (la Roseraie), serving some new districts (Plateaux de la Mayenne and les Capucins), besides other important urban polarities (Hospital CHU, railway station, administrative center). The track insertion involves a general urban renewal, both in the city center and at the 2 terminals.
The future Line B should run west-east starting from Beaucouze passing through the university area, joining Line A at the railway station and serving Monplaisir, Saint-Barthelemy and Trelaze ou les Ponts-de-Ce.
Tramway Angersloiremetropole(official site)
description uptaded on Sep 5th, 2011
map created on Jan 29th, 2011 (© 2005-2013 Ing. M. Tarozzi)
| CHRONOLOGY |
| 25-06-2011 | Ardenne-La Roseraie |
| Country | France
|
| Line | Ligne A
|
| Inhabitants | City 150.000, District 270.000
|
| Date opening | 2011
|
| Future development: | Ligne B (east-west)
|
| Length (km) | 12
|
| Track sections | --
|
| Stops | 25, average distance m 500
|
| Platforms | --
|
| Platform doors | --
|
| general characteristics | --
|
| n. of vehicles | 17
|
| n. of cars per vehicle | 5
|
| Type | steel wheels
|
| Vehicle dimensions (m) | length 32.4, width 2.40
|
| Vehicle capacity (pax) | 203 (56 sedated)
|
| Frequency | 6'/
|
| Current/Voltage | 750 V DC overhead (1.5 km in the city center with APS system)
|
| Guide/gauge | standard gauge rails (1435 mm)
|
| Speed Km/h | Comm. 20, Max 70
|
| Accel./Decel. (m/sec2) | --
|
| System capacity | --
|
| Ridership | 35.000 pax/day
|
| Total cost | 24 M Euro/km
|
| Staff | 120
|
| System builder | ALSTOM
|
| Model | Citadis
|
| NOTE | -- |
technical data uptaded on Feb 11th, 2011