Information portal about all European guided public transportation systems. This site is regularly updated.
Kayseri LRT-TRAM (photo N.6/6 [KB 141] 800 x 529pixels)
   

Source: panoramio.com website


DESCRIPTION
Kayseri tram (Kaysersay) opened on August 2009, running from Oraganize Sanayi to Dogu Terminali. It was extended in 2014 (Dogu Terminali-Ildem 5; Erciyesevler-Erciyes Universitesi/Lojmanlar; Erciyes Universitesi/Lojmanlar-Talas/Cemilbaba).
(last modified February 19, 2017 )
HISTORY
datesection nameline
01-08-2009Oraganize Sanayi-Dogu Terminali--
01-02-2014Dogu Terminali-Ildem 5--
14-02-2014Erciyesevler-Erciyes Universitesi/Lojmanlar--
25-10-2014Erciyes Universitesi/Lojmanlar-Talas/Cemilbaba--
(last modified February 19, 2017 )
TECHNICAL DATA
Single line length (Km)
--
Single line stops
--
Single line avg. distance (km)
--
Total track length (km)
34.4
Total network stops
55
Avg. stop net distance (km)
0.65
Type
steel wheels
Current/Voltage
750 V DC overhead
Guide/gauge
standard gauge rails (1435 mm)
Vehicles builder
ANSALDO
Model
Sirio
Operator
KAYSERI BUYUKSEHIR BELEDIYESI
(last modified February 19, 2017 )
This image is shown smaller (800 x 408 pixels) than its maximum size (936 x 478 pixels)
Please click on the map to enlarge it to its maximum size


report an error

search a city

LATEST UPDATES TO THIS SITE
apm19-02-2017
lrt-tram27-06-2018
metro26-06-2018
funicular20-02-2017
news20-02-2017


LRT-TRAM Kayseri PHOTO
pictures found on server: 6
click on a picture to enlarge it
Total size of this site MB 268