MetroTram Information portal about guided public transportation in Europe since 1980.
The site now contains technical cards of 271 european systems. This site will be periodically updated.
apm   cable   lrt   metro   monorail   tramway   tram on tyres   tram-train  
nations   cities   producers   km   stations   summary   europe   trend   next  
news   author   papers   logos   disclaimer   contacts   links   biblio  

leggi in Italiano A A
search this site ?

Jul 10
- Le Havre: contract signed with Alstom for the delivery of 20 Citadis vehicles for the new tram line
- Barcelona: metro L2 extended from Pep Ventura to Barcelona Pompeu Fabra on 11-07-2010
- London: Gatwick Airport APM (Terminal-North Terminal) reopened on 01-07-2010 after the completion of its renewal
Jun 10
- Barcelona: driverless metro L9/10 extended from Bon Pastor to Sagrera on 26-06-2010
- Bergen: Line 1 (LRT) first section Byparken-Nesttun opened on 22-06-2010
- Moscow: Trubnaya-Marina Roshcha extension of metro Line 10 opened on 19-06-2010
- Alicante: Mercado-Luceros and Sangueta-Puerta del Mar tramway network extensions opened on 18-06-2010
Apr 10
- Venice: Venice People Mover (Piazzale Roma-Tronchetto) opened on 19 April 2010
- Barcelona: driverless metro L9/10 extended from Can Peixauet to Bon Pastor/Gorg on 18 April 2010
Feb 10
- Florence: the first tram line (T1: Florence S.M. Novella-Scandicci) opened on 14 February 2010
- Douai: the first phase (from Guesnain Bougival to Douai-Citè Technique) of a new tram-on-tyres line opened on 08 February 2010
Dec 09
- Wuppertal: Schwebebahn monorail service suspended on 15 December 2009 due to security reasons (heavy maintenance works) until spring 2010
- Barcelona: driverless metro L9/10 opened on 13 December 2009 (Can Peixauet-Can Zam section)
- Dublin: Busaras-The Point stretch (tram Red Line) opened on 8 December 2009
Nov 09
- Sevilla: Condequinto-Olivar de Quinto section (LRT Line 1) opened on 23 December 2009
Sep 09
- Sevilla: Puerta Jerez stop (LRT Line 1) opened on 16 September 2009
- Brest: contract signed with Alstom for the delivery of 20 Citadis vehicles for the new tram line
- Dijon: contract signed with Alstom for the delivery of 32 Citadis vehicles for the new tram line
- Sheffield: tram-train trial service (along an existing freight railway from Meadowhall to Rothenham, with a connection to the Supertam network) announced on 16 September 2009
- Karlsruhe: contract signed with Bombardier for the delivery of 30 Flexity Swift dual vehicles (2011-2013, 129 M Euro)
- Athens: Nomismatokopio (metro Line 3) opened on 02 September 2009
Aug 09
- Lisbon: Alameda-Sao Sebastiao extension of Linha do Oriente (Vermelha) opened on 29 August 2009
Jul 09
- Bilbao: Portugalete-Santurtzi extension of LRT Line 2 opened on 4 July 2009
- Mulhouse: Rattachement-Chataignier extension of tram Line 1 opened on 4 July 2009
May 09
- Sofia: Vasil Levski Stadium-Mladost 1 section of metro Line 1 opened on 08-05-2009
Apr 09
- Bologna: assigned on 28 April 2009 the project financing for the automated monorail connecting Marconi Airport to the railway station
- Sevilla: the new LRT Line 1 (first section Ciudad Expo-Condequinto) opened on 02 April 2009
Jan 09
- Istanbul: 4 Levent - Ataturk Oto Sanayi and Taksim - Sishane metro extensions opened on 30 January 2009

Open News 2008 archive

Open News 2007 archive

Open News 2006 archive

Open News 2005 archivie